Motor Cruiser 46 Giorgi Cantieri Navali Open 46 Aft Cabin
MASSIVE REDUCTION - MUST SELL!
- Boat REF# · 271460
- LOA · 46'0"
- Year · 1990
- Construction · GRP
- Underwater profile · Planing
- Berths · 4
- Engine · 2 x Diesel 425hp, Caterpillar 3208 (1990)
- Lying · Plymouth area
Extra Details
Designer | Cantieri Navali |
---|---|
Builder | Giorgi Cantieri |
Lying | Plymouth area |
Fuel capacity | 2,000.0 ltr Total - 2 Tanks |
Water capacity | 1,000.0 ltr Total - 1 Tanks |
Holding tank capacity | 193.0 ltr Total - 1 Tanks |
Last survey | 26/04/2019 |
Mechanical
Engine | 2 x Diesel 425hp |
---|---|
Engine make and model | Caterpillar 3208 (1990) |
Engine Hours | Not Recorded |
Engine Cooled | Indirect |
Steering | Wheel |
Drive | Shaft |
Prop(s) | Fixed 3 blade |
Fuel consumption (approx) | Not Recorded |
Cruising speed (approx) | 24 knots |
Max speed (approx) | 30 knots |
Engine hours not recorded
Summer 2019 Professional extensive engine check, test & overhaul by West Marine Services, Brighton including new filters, new belts, new impellers, new oils, new anodes, new gaskets / seals / clips, new STB exhaust manifold, new gearbox filters, coolant drained & replaced, fuel system bleed, steering system check, stern glands stripped & cleaned, shafts & props removed & cleaned, heat exchanger & gearbox oil coolers cleaned & maintained etc. (£15k+ copy invoices available)
June 2019 New prop shafts, new cutlass, new stern glands x 2
April 2019 Inspection & upgrade of onboard electrical systems by Eurotek Marine Electronics including review & upgrade of galley electrics, new electric sockets, installation of Victron Multi Inverter, new digital TV antenna & sockets, stereo speakers, 2nd shore input for air conditioning unit etc. (£25k approx copy invoices available)
Aug 2019 New Varta 230 batteries x 2 (£530)
2018 New LED deckhead lighting
2018 New Engine earth bonding system
Dec 2018 New battery charger
2015 New engine sea cocks
Video attached of vessel underway at sea
Dimensions
LOA | 46'0" |
---|---|
Beam | 13'7" |
Draft Min | 4'3" |
Draft Max | 4'3" |
Displacement | 15,000kg |
Headroom | 6'4" |
Storage | On marina |
Electrical Systems
24 volt battery, 4 batteries charged by: engine, shore power
Construction
Construction | GRP |
---|---|
Underwater profile | Planing |
Finish | Gelcoat finish |
April 2019 Hull scrub, antifoul, compound & polish (£1.4k approx)
June 2019 Diesel tanks cleaned (£2.3k approx)
July 2019 New holding tank with new valves, pump, gauge, vent, filter etc. (£2.5k approx)
Accommodation
Total # of berths | 4 |
---|---|
No. of double berths | 2 |
Cabin(s) | 2 |
Handbasin | 2 |
Shower | 3 |
Air conditioning | 1 Air conditioning Units |
Heads | 2 heads (Electric) |
April 2019 New upholstery (£1.9k approx)
April 2019 New carpets (£1.7k approx)
2019 New galley units installed (£5.7k approx)
Hoover full sized fridge & Frigidaire full sized freezer
Aug 2019 Air conditioning system inspection
Large walk-in hanging locker in forward cabin
Bespoke sprung mattress in forward cabin, under 3 years old
Private ensuite aft cabin with double berth (new mattress)
2015 New forward electric heads
4 burner Electric cooker/stove
Accommodation
Cooker/stove | |
---|---|
Grill | |
Oven | |
Sink | |
Refrigerator | |
Freezer | |
Carpet | |
Air conditioning | |
Cabin heating | |
Pressurised water system | |
Hot water system | |
Cockpit shower |
April 2019 New upholstery (£1.9k approx)
April 2019 New carpets (£1.7k approx)
2019 New galley units installed (£5.7k approx)
Hoover full sized fridge & Frigidaire full sized freezer
Aug 2019 Air conditioning system inspection
Large walk-in hanging locker in forward cabin
Bespoke sprung mattress in forward cabin, under 3 years old
Private ensuite aft cabin with double berth (new mattress)
2015 New forward electric heads
4 burner Electric cooker/stove
Deck Gear
Warps | |
---|---|
Fenders | |
Boathook | |
Swim Platform | |
Swim Ladder | |
Instrument Covers | |
Passerelle | |
Cockpit Enclosure |
Electric windlass (with remote control)
1 anchors
(CQR)
32'10" of chain
Aug 2019 New windlass motor
Aug 2019 New anchor locker chain end plate
Aug 2019 New LED deck lights, nav lights, flood lights & anchor light
Passerelle teak replaced 2017/2018
Flexiteak decking, cockpit covers, 2007
Nav Equipment
Compass | |
---|---|
Speed | |
Log | |
Radar | |
VHF | |
VHF DSC radio | |
GPS | |
Chart plotter | |
Autopilot | |
Stereo | |
Navigation lights | |
TV | |
DVD | |
AIS Receiver | |
Echo sounder |
April 2019 New Offshore Steering Compass
April 2019 Navionics Platinum Chart updated
May 2019 New Evolution Solenoid Autopilot (£2.3k approx)
May 2019 New Rudder Angle Transducer
May 2019 New Raymarine EVO Pilot System (3 year warranty)
August 2019 New AIS700 Class B Transceiver
2017 New Raymarine Ray 53 VHF DSC
Sailor Compact VHF RT2048
Samsung Colour TV
Fusion MS Avaco Marine Stereo
Safety Equipment
Carbon Monoxide detector | |
---|---|
Liferaft | |
Life jackets | |
Life buoys | |
Searchlight | |
Horn | |
Boarding ladder |
4 bilge pumps (0 manual / 4 Electric)
July 2019 New Sea Cruiser ISO9650-2 Liferaft 4 Man
July 2019 New Liferaft Stainless Cradle
July 2019 New Lifejackets x 4
July 2019 New Coastal First Aid Kit & Handbook
July 2019 New Coastal Flare Pack
July 2019 New Fire Blanket
July 2019 New Fire Extinguisher x 3 (serviced Sept 2019)
(£2k new safety equipment copy invoice available)
Broker's Comments
The current owner has transformed this boat into a wonderfully spacious and in my opinion well thought out liveaboard. He has thoroughly enjoyed his time living onboard, however his circumstances have now changed and he is reluctantly having to move ashore. The owner advises us that the boat can very easily be returned to her former status as a spacious fast cruiser.
Over the course of 2019, this Giorgi Cantieri Navali Open 46 has undergone a 12 month £60k refurbishment programme. This has included a professional check and overhaul of the engines & electrics, new navigation equipment, new batteries, new upholstery & carpets, new galley units, new LED deck & nav lights, the servicing of existing & supply of new safety equipment, GRP & gelcoat modification & repair work, the installation of new stereo speakers, a new holding tank and a new Victron Multi Inverter amongst many other things.
Spacious and well equipped, the fully furnished accommodation layout includes a forward cabin, midships double cabin with saloon, galley, two heads, showers and a completely separate / private ensuite double aft cabin for visiting family & friends.
Sleek, stylish and fast, this attractive, modern Sports Express Cruiser would make a fantastic houseboat , river cruiser and coastal cruiser/sport boat.
Please also note that some new video footage has now been shot onboard below decks which shows the vessel with and without a new dividing bulkhead which was installed by the current owner to provide an extra double cabin and separate saloon area down below.
The owner informs us that this boat was lifted, pressure washed and re-antifouled in December 2022.
These boat details are subject to contract.
Please contact me directly for further details.
Owners FAQ's
How long have you owned the boat for?
4 years.
Why are you selling her?
Giving up boating.
Where have you sailed her?
From Brighton to Plymouth.